For sponsors
How to Raise Capital for a Data Center Project or Fund
Data center raises
- Primary-market vacancy, H1 2026
- 1.4%, a record low (CBRE)
- Capacity under construction
- 7,481 MW, 80.4% committed (CBRE)
- Shell-and-core cost, 2026 forecast
- $11.3 million per MW (JLL)
- Grid connection wait, primary markets
- Over four years (JLL)
- Data-center-named Form D notices
- 11 (Oct 2025 to Sep 2026)
- Data center and digital infrastructure notices using Rule 506(b)
- 92% (23 of 25)
CBRE (Aug 27, 2026), JLL 2026 Global Data Center Outlook (Jan 5, 2026) and Relli analysis of SEC Form D data sets, pulled Nov 13, 2026.
The short answer
Data center sponsors raise most equity from infrastructure funds and joint venture partners under Rule 506(b), because shell and core cost about $11.3 million per megawatt before fit-out (JLL) and investors want committed power and a pre-lease first. Relli lists offerings from reviewed sponsors whose powered land, edge or leased deals are sized for individual investors under Rule 506(c).
Data center raises
- Primary-market vacancy, H1 2026
- 1.4%, a record low (CBRE)
- Capacity under construction
- 7,481 MW, 80.4% committed (CBRE)
- Shell-and-core cost, 2026 forecast
- $11.3 million per MW (JLL)
- Grid connection wait, primary markets
- Over four years (JLL)
- Data-center-named Form D notices
- 11 (Oct 2025 to Sep 2026)
- Data center and digital infrastructure notices using Rule 506(b)
- 92% (23 of 25)
CBRE (Aug 27, 2026), JLL 2026 Global Data Center Outlook (Jan 5, 2026) and Relli analysis of SEC Form D data sets, pulled Nov 13, 2026.
- Power decides the deal. The average wait for a grid connection in primary markets exceeds four years (JLL), and AEP Ohio bills large new data centers for at least 85% of subscribed power for 12 years.
- The product sets the budget. In a powered shell the tenant usually funds its own fit-out; in a turnkey lease the landlord does, and JLL puts AI fit-out at up to $25 million per megawatt.
- Demand still outruns supply. Primary-market vacancy fell to a record 1.4% in H1 2026, and 80.4% of capacity under construction was already committed (CBRE).
- Individual-investor raises are rare. Relli found 11 Form D notices with data center names from October 2025 to September 2026; 23 of 25 data center and digital infrastructure notices used Rule 506(b).
- Most funds sell only to the very wealthy. 15 of those 25 notices relied on the Investment Company Act exclusion for qualified purchasers, people with at least $5 million in investments.
In this guide · 12 sections
- What has to be in place before you raise capital for a data center?
- Where does your project sit in the utility queue, and why do investors ask first?
- Powered land, powered shell or turnkey: which data center product are you selling?
- How does a hyperscale pre-lease change the financing?
- Do cooling and rack density change what investors underwrite?
- How much equity does a 1 MW or 10 MW data center need?
- Is data center demand still ahead of supply?
- Why do so few data center raises show up as public offerings in Form D data?
- Which data center deals can a smaller sponsor raise from individual investors?
- Who funds data centers: infrastructure funds, JV partners or individual investors?
- What should the power file and data room contain?
- What do data center sponsors ask about power, cost and investors?
The short version
What has to be in place before you raise capital for a data center?
Legally, a data center raise is ordinary: a project company or fund, an offering under Rule 506(b) or 506(c) of Regulation D, and a Form D notice filed within 15 days of the first sale. Commercially, it runs in a different order from almost any other property type. Equity investors want three answers before they read the pro forma: how many megawatts the utility has committed and when they arrive, who will lease the capacity, and what each megawatt costs to deliver. A site without contracted power is land with a plan; a finished building without a tenant is a construction bet.
- Get in the utility queue early. A load study, an interconnection timeline, the tariff and any minimum-bill or exit terms all come before the raise.
- Name the product. Powered land, a powered shell, a turnkey hyperscale hall, a multi-tenant colocation facility or a small edge site each attract a different investor and lender.
- Chase the pre-lease. A signed lease from a hyperscale or large enterprise tenant is what makes construction debt and institutional equity available.
- Design for density. State the rack density and cooling approach the building supports, and what an upgrade to liquid cooling would cost.
- Size the stack to the investor. Infrastructure funds and joint venture partners for large campuses; family offices and individual investors only where the check sizes work, as compared below.
The filing and documentation steps every sponsor follows are in the guide to running a syndication raise, and the investor's view of hyperscale, colocation and edge is in how to invest in data center real estate. This page covers power, product, tenants and who actually funds data centers.
Power first
Where does your project sit in the utility queue, and why do investors ask first?
Power is the input that cannot be bought quickly, so it sets both the schedule and the risk. A sponsor usually starts by asking the utility to study the load, then negotiates an agreement that commits capacity by date and may require the customer to fund substation or transmission upgrades. Some sponsors add on-site generation or a phased ramp to start earlier. Investors want to see where the project stands in that process, in writing. Three dated facts frame the conversation:
- Connections take years. JLL reported in January 2026 that the average wait for a grid connection in primary data center markets exceeds four years.
- Utilities shift cost to the data center. On July 9, 2025, Ohio regulators adopted AEP Ohio's proposal requiring large new data center customers to pay for a minimum of 85% of the energy they subscribe to use, for 12 years including a 4-year ramp-up, and to prove they are financially viable. A minimum bill like this is a fixed cost in the pro forma, whether or not the tenant draws the power.
- Demand keeps climbing. The U.S. Department of Energy estimated that data centers used about 4.4% of U.S. electricity in 2023 and could use 6.7% to 12% by 2028.
CBRE's H1 2026 report said power availability and infrastructure delivery timelines "remain the most decisive factors" in site selection, leasing and pricing. Expect investors to ask about energization dates before they ask about returns, and to ask what happens to their capital if power arrives a year late.
| Topic | What investors ask | What to show |
|---|---|---|
| Power | How many megawatts does the utility commit, on what dates, and under which tariff? | Load study, utility agreement or commitment letter, energization schedule, minimum-bill and exit terms, backup generation plan |
| Tenant | Is capacity pre-leased, to whom, for how long, and who funds the fit-out? | Signed lease or letter of intent, tenant credit, term, renewals, escalators, fit-out responsibilities |
| Product | Powered land, powered shell, turnkey, colocation or edge? | The product defined, with comparable leases or land sales for that product only |
| Delivery cost | What does a megawatt cost here, and how much contingency sits in the budget? | Budget per MW split into shell, core and fit-out, contract type, contingency and a dated benchmark |
| Density and cooling | Can the halls take high-density AI racks, or only conventional air-cooled loads? | Design density per rack, cooling system, water use and the cost and time to retrofit |
| Site and permits | Is zoning in place, are generator air permits obtainable, and is there local opposition? | Entitlement status, permit plan, fiber routes and any state or local tax incentives relied on |
| Delivery team | Has this team energized and leased a data center before? | Projects completed with megawatts, energization dates, tenants and results |
Product
Powered land, powered shell or turnkey: which data center product are you selling?
The product decides who carries the cost of electrical and mechanical equipment, and that split decides how much equity the sponsor has to raise. Investors will want the product named precisely, because a turnkey lease and a powered shell lease on the same megawatts have very different budgets.
| Product | What the sponsor delivers | Who funds the fit-out | Typical investor |
|---|---|---|---|
| Powered land | Entitled land with a committed power path, sold or ground leased to a developer or end user | The buyer or ground tenant | Family offices and individual investors comfortable with entitlement and utility risk |
| Powered shell | The building and utility power to the site | Usually the tenant, which installs its own electrical and cooling systems | Investors who underwrite it much like a net lease to a strong tenant |
| Turnkey (wholesale or hyperscale) | A finished data hall with power distribution, cooling and backup systems | The landlord, recovered through higher rent | Infrastructure funds and JV partners able to fund large capital budgets |
| Colocation | Space, power and cooling leased to many customers by the cabinet, cage or suite | The operator | Operators and their capital partners; leasing risk stays with the owner |
| Edge | A small facility close to users, often in a secondary market | Varies by deal; often the operator | Smaller sponsors, family offices and individual investors, given the smaller check |
Pricing language differs too. Wholesale and colocation rents are usually quoted per kilowatt per month rather than per square foot, so show investors rent per kW beside comparable deals, and say whether power costs pass through to the tenant.
Hyperscale pre-leases
How does a hyperscale pre-lease change the financing?
A pre-lease signed with a hyperscale cloud provider or a large AI company before construction turns a speculative build into a contracted one. Lenders can size construction debt against the lease, and institutional equity treats the project as closer to infrastructure than to development. CBRE's finding that 80.4% of North American capacity under construction was already committed in H1 2026 (more below) shows how much space is spoken for before it is finished.
- What investors read in the lease. Term, rent escalators, delivery deadlines and the penalties or termination rights if the sponsor misses them, plus who pays for power and fit-out.
- Concentration. One tenant can take a whole building or campus. Investors weigh the tenant's credit against the risk of a single renewal decision.
- Delivery risk shifts to the sponsor. With a pre-lease, the main risk becomes delivering power and the building on time. Show the schedule float and the contractor's track record.
Without a pre-lease, the sponsor is raising for a speculative building, and investors price that leasing risk into the return they ask for. Smaller sponsors often avoid that position by raising for land and power only, then selling or partnering once a tenant appears.
Cooling and density
Do cooling and rack density change what investors underwrite?
Yes. AI training and inference servers draw far more power per rack than conventional enterprise or cloud servers, and air cooling alone struggles at those densities. Operators are adding liquid cooling, such as direct-to-chip systems and rear-door heat exchangers, which change the mechanical plant, the floor loading and sometimes water use. JLL's estimate that AI fit-out can reach $25 million per megawatt (next section) reflects that equipment.
For a raise, this is a question about obsolescence. Investors ask whether the building can serve higher-density tenants later without a full rebuild, who pays for that upgrade, and whether water rights and local permits allow the cooling design. A building designed only for conventional loads may still lease well, but say so plainly and price the upgrade path.
The capital stack
How much equity does a 1 MW or 10 MW data center need?
Data centers need far more capital per square foot than other property types, which is why institutions supply most of it. JLL put the average global cost to build a data center's shell and core at $10.7 million per megawatt in 2025 and forecast $11.3 million for 2026. For AI infrastructure, the technical fit-out can cost as much as $25 million per megawatt on top of that.
Worked example
Illustrative only, using JLL's 2026 global average of $11.3 million per MW for shell and core, and assuming construction debt covers 60% of cost:
- 10 MW building: $113 million of cost, a $67.8 million loan and $45.2 million of equity. At $100,000 per investor, that is 452 investors.
- 1 MW edge site: $11.3 million of cost. With debt at 60%, equity is $4.52 million, or about 45 investors at $100,000 each.
The math sorts the market. A 10 MW building needs a joint venture partner or fund writing eight- or nine-figure checks; raising $45 million in $100,000 pieces is impractical for most sponsors. A small edge site, a powered land assemblage or an already leased building can be sized for individual investors. At the top of the market, JLL estimates that about 100 GW of new supply by 2030 needs roughly $3 trillion of investment, including about $870 billion of new debt financing.
Market in late 2026
Is data center demand still ahead of supply?
Yes, by the measures investors watch most: vacancy at a record low, construction mostly pre-committed and rents still rising. These were the latest published figures as of November 13, 2026.
- Vacancy hit a record low. North American primary-market vacancy fell to 1.4% in H1 2026 from 1.6% a year earlier (CBRE, Aug 27, 2026).
- Construction is largely spoken for. Capacity under construction rose 24.8% to a record 7,481.1 MW, and 80.4% of it was committed, up from 74.3% a year earlier. Primary-market supply rose 33.7% to 10,903 MW.
- Rents climbed. Average rental rates for 3 to 10 MW deployments rose 8.3% in H1 2026, and 6.7% for deployments over 10 MW.
- Backlogs are at records. Digital Realty reported a record $2.5 billion of signed leases not yet commenced at 100% share at the end of Q3 2026, renewal rents up 11.8% on a cash basis, and about 9.8 gigawatts of buildable IT capacity under development or held for it (Oct 29, 2026).
The same release shows where institutional equity is heading: after the quarter, Digital Realty closed $1.4 billion of initial cornerstone equity commitments to a new perpetual capital strategy focused on stabilized hyperscale data centers in North America. That is the scale a smaller sponsor competes against for institutional money, and one reason smaller sponsors turn to family offices and individual investors for land, edge and leased deals.
Relli Form D data
Why do so few data center raises show up as public offerings in Form D data?
Because most data center equity is raised quietly from a small number of very wealthy or institutional investors. In the twelve months to September 30, 2026, Relli found just 11 new U.S. Form D notices with data center names, against 4,172 real estate offerings in Relli's Form D study, and 23 of the 25 data center and digital infrastructure notices combined stayed with Rule 506(b).
| Group | Notices | Median offering size | Used Rule 506(c) | Relied on 3(c)(7) |
|---|---|---|---|---|
| Data center names, any industry group | 11 | $30.0 million (7 stated a size) | 18% (2) | 3 |
| Digital infrastructure fund names | 14 | Not meaningful; 10 stated "Indefinite" | 0% | 12 |
| Both groups together | 25 | Not meaningful | 8% (2) | 15 (60%) |
| All real estate (Relli Form D study) | 4,172 | $5.0 million | 29.3% | Not compared |
- Almost nothing is advertised. 23 of the 25 notices used Rule 506(b), which bars general solicitation.
- Qualified purchasers dominate. 15 of 25 relied on Section 3(c)(7) of the Investment Company Act, which requires every owner to be a qualified purchaser: for an individual, someone who owns at least $5 million in investments.
- Brokers are scarce. 2 of the 11 data center names reported sales commissions or finder's fees, one of them a net-leased data center DST.
Method
Relli used the SEC's Form D data sets for 2025 Q4 to 2026 Q3, counting first-time notices from U.S. addresses and skipping amendments. "Data center" rows are issuer names with "data center," "colocation," "hyperscale," "powered land" or "powered shell" in any industry group; "digital infrastructure" rows may also cover towers and fiber. Dropped: lending and debt names, tiny REIT preferred-share filings ($300,000 or less with minimums of $3,000 or less) made only to satisfy the REIT 100-holder rule, and "AI infrastructure" venture funds that buy companies rather than property.
Smaller sponsors
Which data center deals can a smaller sponsor raise from individual investors?
Without an institutional partner, a sponsor usually raises for a deal with a smaller, clearer risk. Each structure answers the power and tenant questions differently.
- Powered land. Buy and entitle land with a utility path, then sell or ground lease it to a developer. The check is smaller, but the value depends on the power commitment arriving on time.
- Edge or colocation site. A smaller facility with several customers, in a secondary market or near users. Lower cost per project, but the sponsor carries the leasing risk and customer credit varies.
- Leased building. A data center already leased to a creditworthy tenant, held in an LLC or a Delaware statutory trust for 1031 exchange buyers. Investors underwrite the lease like a net lease; see raising capital for net lease.
- Minority co-investment. Your investors take a minority share of a larger joint venture. The partner controls most decisions, so disclose the joint venture terms in full.
- Development fund. A blind pool for a pipeline. It needs an Investment Company Act exclusion, often Section 3(c)(1) (100 beneficial owners) or 3(c)(7) (qualified purchasers only), and an answer on adviser registration; see raising your first real estate fund.
Where the money comes from
Who funds data centers: infrastructure funds, JV partners or individual investors?
Mostly infrastructure funds and joint venture partners, with tenants' pre-leases making the debt possible. Individual investors fill a narrow band: land, edge and leased buildings sized for their checks.
| Route | Who brings the investor | Fits | Exemption |
|---|---|---|---|
| Relli and other public offering marketplaces | Investors see the listing and approach your team | Established sponsors with powered land, edge or leased deals sized for individual checks | 506(c), because a public listing is general solicitation |
| Infrastructure and real asset funds | Capital advisers, brokers and your delivery record | Hyperscale campuses and turnkey development with a pre-lease | Negotiated joint venture; the funds themselves often rely on 3(c)(7) |
| Developer-operator joint ventures | Operators looking for sites, power or local partners | Sponsors who control land and power but not the operating platform | Negotiated private deal |
| Hyperscaler and enterprise pre-leases | The tenant's site selection team | Not equity, but the contract that unlocks construction debt and JV equity | A lease, not a securities offering |
| Landowners contributing sites | Your land search and utility conversations | Powered land deals where the owner takes equity instead of cash | Usually 506(b) or a negotiated contribution agreement |
| Family offices | Introductions and your network | Powered land, co-investment and pre-development equity | Either; see the family office guide |
| Broker-dealers and DST sponsors | A registered broker-dealer earning a commission | Leased data centers packaged for 1031 exchange buyers | Either, with the firm named on Form D; see placement agents and broker-dealers |
| Prior investors and personal network | You | Minority co-investment beside a partner, or whole small projects | 506(b) or 506(c) |
Data room
What should the power file and data room contain?
A data center investor should be able to check power, tenant and budget without calling you. Start with the power file, because everything else depends on it.
- Power file: load study, utility agreement or commitment letter, megawatts by date, tariff and minimum-bill terms, upgrade costs you fund, exit fees and the backup generation plan.
- Lease file: signed lease or letter of intent, tenant financials or rating, term, renewals, escalators, delivery deadlines and penalties, and the fit-out split.
- Technical design: rack density, cooling system, water source and use, redundancy level and the upgrade path to liquid cooling.
- Site file: zoning and entitlements, generator air permits, fiber routes, and any tax incentive the pro forma relies on.
- Budget: cost per megawatt for shell, core and fit-out, contract type, contingency and a benchmark with date and source.
- Schedule: entitlement, construction and energization dates, and what happens to investors if power slips.
- Debt terms: lender, rate, loan-to-cost, recourse, completion guarantees and maturity.
- Sponsor economics: development fee, asset management fee and promote, in dollars on the same pro forma; see sponsor fees and promote.
- Delivery record: each data center or comparable project, with megawatts, energization dates, tenants and outcomes.
- Risk factors and legal documents: technology change, tenant concentration, local opposition and power price risk stated directly, then the PPM, operating agreement, subscription agreement and filed Form D.
Sponsor questions
What do data center sponsors ask about power, cost and investors?
What does a data center cost per megawatt?
JLL put the average global cost of a data center's shell and core at $10.7 million per megawatt in 2025 and forecast $11.3 million for 2026. For AI infrastructure, technical fit-out can add as much as $25 million per megawatt. Costs vary with market, design and density, so investors expect your own budget set against a dated benchmark.
Why do most data center funds sell only to qualified purchasers?
A fund owned only by qualified purchasers (for an individual, someone with at least $5 million in investments) can rely on Section 3(c)(7), which has no 100-owner cap. In Relli's Form D data, 15 of 25 data center and digital infrastructure notices relied on it, and 23 of 25 used Rule 506(b). Individual investors, who must be accredited, fit mainly leased, edge and powered land deals.
Should a data center sponsor raise before power is secured?
Investors rarely commit construction equity before a credible power commitment, because the grid connection sets the timeline, and JLL reported average waits above four years in primary markets. Some sponsors raise a smaller pre-development round to secure land and power, then raise construction equity once the utility terms are known, disclosing the risk at each stage.
Who pays for the fit-out in a powered shell versus a turnkey lease?
In a powered shell lease, the landlord delivers the building with utility power and the tenant usually installs its own electrical and cooling equipment. In a turnkey lease, the landlord delivers a finished data hall and recovers the cost through higher rent. With JLL putting AI fit-out at up to $25 million per megawatt against $11.3 million for shell and core, that split can outweigh every other budget line, so name the product in every document.
How are data center rents quoted?
Wholesale and colocation rents are usually quoted per kilowatt per month, not per square foot, because power capacity is what the tenant is buying. Show investors rent per kW beside comparable deals of similar size, and say whether electricity is passed through to the tenant. CBRE reported 3 to 10 MW rents up 8.3% in H1 2026.
Sources
- North America Data Center Trends H1 2026, CBRE (Aug 27, 2026 | accessed Nov 13, 2026)
- 2026 Global Data Center Outlook, JLL (Jan 5, 2026 | accessed Nov 13, 2026)
- Digital Realty third quarter 2026 earnings release (Form 8-K, Exhibit 99.1), SEC EDGAR (Oct 29, 2026)
- AEP Ohio proposal on data centers to protect Ohio consumers adopted by PUCO, AEP (Jul 9, 2025 | accessed Nov 13, 2026)
- DOE releases new report evaluating increase in electricity demand from data centers, U.S. Department of Energy (Dec 20, 2024 | accessed Nov 13, 2026)
- Form D data sets (2025 Q4 to 2026 Q3), SEC Division of Economic and Risk Analysis (period Oct 1, 2025 to Sep 30, 2026 | pulled Nov 13, 2026)
- 15 U.S. Code 80a-2(a)(51), definition of qualified purchaser, Legal Information Institute, Cornell Law School (accessed Nov 13, 2026)
- 15 U.S. Code 80a-3(c)(1) and (c)(7), investment company exclusions, Legal Information Institute, Cornell Law School (accessed Nov 13, 2026)
- 17 CFR 230.506, exemption for limited offers and sales without regard to dollar amount, Legal Information Institute, Cornell Law School (accessed Nov 13, 2026)
- Relli private real estate minimums data study (Form D, 4,172 offerings), Relli (Oct 20, 2026)