How to Raise Capital for a Ground-Up Real Estate Development

Development raises

Development-named Form D notices
84 (Oct 2025 to Sep 2026)
Median size, single project
$2.75 million
Median size, development funds
$16.0 million
Used Rule 506(c)
27% (funds 36%)
Supervisory limit, commercial construction
80% of value (12 CFR 365)
SOFR, Nov 12, 2026
3.90%

Relli analysis of SEC Form D data sets, pulled Nov 13, 2026; 12 CFR Part 365 Appendix A; Federal Reserve Bank of New York.

The short answer

Developers raise ground-up equity in stages: their own money for site control and entitlements, then construction equity sized to the lender's loan-to-cost and spent before the first draw, with principals signing completion and carry guarantees. Form D notices with development names show single projects at a median $2.75 million and development funds at $16.0 million, per Relli's analysis.

Development raises

Development-named Form D notices
84 (Oct 2025 to Sep 2026)
Median size, single project
$2.75 million
Median size, development funds
$16.0 million
Used Rule 506(c)
27% (funds 36%)
Supervisory limit, commercial construction
80% of value (12 CFR 365)
SOFR, Nov 12, 2026
3.90%

Relli analysis of SEC Form D data sets, pulled Nov 13, 2026; 12 CFR Part 365 Appendix A; Federal Reserve Bank of New York.

  • Equity goes in first. Construction lenders usually fund draws only after the sponsor's equity is spent, so investors carry the earliest and riskiest dollars in the project.
  • Development raises are mostly private. 84 development-named Form D notices (Oct 2025 to Sep 2026) had a median offering size of $6.4 million; 27% used Rule 506(c), against 29.3% for real estate overall.
  • Banks tightened in Q3 2026. The Fed's October 2026 senior loan officer survey found tighter standards and weaker demand for construction and land development loans.
  • Overruns are paid in a set order. Contingency first, then the principals under their completion and carry guarantees, then capital calls under the operating agreement, which can dilute members who do not fund.
  • Regulators cap construction leverage. Federal lending guidelines set supervisory loan-to-value limits of 65% for raw land, 75% for land development and 80% for commercial and multifamily construction.
In this guide · 12 sections
  1. How do you raise capital for a ground-up real estate development?
  2. Who pays for land, entitlements and pre-development before the main raise?
  3. How does a development capital stack differ from buying a stabilized property?
  4. Who guarantees a construction loan, and who pays for cost overruns?
  5. What do investors ask before funding a development?
  6. Is construction financing harder to get now?
  7. How large are development raises, according to Form D?
  8. Should a development raise use Rule 506(b) or 506(c)?
  9. How are the pref, promote and development fee structured in a development deal?
  10. Where can a developer find equity beyond past investors?
  11. What goes in a development data room before you pitch investors?
  12. What do developers ask about funding a ground-up project?

The short version

How do you raise capital for a ground-up real estate development?

Raising capital for a ground-up development uses the same securities toolkit as buying a finished asset: a single-project LLC or a fund as the issuer, Regulation D (Rule 506(b) or 506(c)) as the exemption, and Form D on file no later than 15 days after the first sale. The difference is sequence and risk. Money arrives in stages (site, entitlements, construction), the lender sizes its loan on budget rather than income, your investors' equity is spent before the loan funds a dollar, and the asset they are buying is a set of drawings, permits and a contract.

  1. Control the land and the approvals. A purchase contract or option, then zoning and permits. This stage carries the most risk, and sponsors usually fund it with their own pre-development money.
  2. Get a construction loan term sheet. Its loan-to-cost ratio fixes the equity you need; its guarantee, reserve and extension terms are what your investors will interrogate.
  3. Convert the estimate into a contract. A signed construction agreement, a contingency and a draw schedule are what make a budget underwritable.
  4. Choose the vehicle and exemption. A single-project LLC or a development fund, then 506(b) or 506(c), covered below.
  5. Match money to stage. Your own capital for pre-development; past investors, a JV partner, opportunity zone or EB-5 money, a landowner's contribution or a listing marketplace for construction equity.

Entity formation, the PPM and Form D mechanics are covered step by step in the syndication capital-raising guide. This guide is about what changes when nothing has been built yet: funding by stage, the construction capital stack, guarantees and overruns, investor diligence, 2026 lending conditions, Form D evidence, exemptions, deal terms and equity sources.

Funding by stage

Who pays for land, entitlements and pre-development before the main raise?

Usually the developer, a few close backers or the landowner, because outside investors and lenders rarely fund a site that might never be approved. Each stage has its own risk and its own typical source of money, and investors in the construction raise will ask how the earlier stages were paid for.

Development stages and how each is commonly funded, as of Nov 14, 2026. Supervisory loan-to-value limits from 12 CFR Part 365, Appendix A; the rest is a Relli summary of general practice, not a rule. Projects vary.
StageWhat is being paid forTypical moneyMain risk
Site control Option fees or deposits on a purchase contract with time to seek approvals The developer's own cash Losing the deposit if the site does not work
Entitlements Zoning changes, site plan approval, studies, hearings and the consultants who run them Developer cash, a small friends-and-backers round, or a landowner who waits to be paid Denial, conditions that shrink the project, appeals and delay
Land purchase Closing on the site, often once approvals are in hand Equity, or a land loan; supervisory limits are 65% of value for raw land and 75% for land development Carrying costs if the construction loan is late
Pre-construction Architecture, engineering, permit fees and contractor pricing Developer and early-investor equity, credited to the main raise Bids that come in above the budget
Construction Hard and soft costs through completion The main equity raise, spent first, then construction loan draws Cost overruns, schedule slips and rate moves

Three patterns to plan for:

  • Early money earns more. Investors who fund entitlement risk expect a better deal than those who arrive after permits, such as a larger share or a credit for their capital at a stepped-up value when the main raise closes. Write that down before you take the money.
  • Borrowed sponsor equity reads badly. The FDIC's examination manual calls unsecured "front money" loans used for a developer's equity "symptomatic of an undercapitalized, inexperienced or inept builder." Investors draw the same conclusion when your co-invest is borrowed.
  • The landowner can be a partner. Some owners contribute the site for an equity interest instead of cash, which cuts the raise but adds a partner with views on price and timing. That interest is a security too, so counsel papers it as one.

The capital stack

How does a development capital stack differ from buying a stabilized property?

A stabilized purchase is financed on value and income and funds in one closing. A development is financed on cost, funds in a fixed order over a year or more, and leans on the sponsor's guarantees because there is no rent yet. Three features follow.

  • Loan-to-cost leads, value caps. Construction lenders lend a share of the budget, and federal banking guidelines also limit loans against appraised value: the Interagency Guidelines for Real Estate Lending set supervisory limits of 65% for raw land, 75% for land development, 80% for commercial and multifamily construction and 85% for one- to four-family residential construction (12 CFR Part 365, Appendix A). Banks usually set their own limits lower.
  • Your investors fund first. Loans are disbursed in draws against completed work, and lenders usually require the equity to be spent before the first draw. That makes LP money the first and riskiest dollar in the project.
  • The lender wants principals on the hook. The FDIC's examination manual lists takeout commitments, completion bonds and inspection reports among the standard documents behind a commercial construction loan, and lenders add personal or corporate guarantees, covered in the next section.
Ground-up development capital stack, most senior first, as of Nov 14, 2026. Supervisory limits from 12 CFR Part 365; the rest describes typical arrangements rather than quoting any lender. Terms differ by lender and project.
LayerWho provides itHow it worksWhat investors ask
Construction loan Banks, debt funds and life companies; HUD-insured lenders for some apartments A share of total cost at a floating rate, drawn monthly as work is inspected, and repaid from a refinance or sale Loan-to-cost, spread over the index, maturity and extension tests, guarantees, and how the loan gets taken out
HUD Section 221(d)(4) FHA-approved lenders, with HUD insurance A single loan for new construction or substantial rehabilitation of apartments that stays as the long-term debt, for up to 40 years How long approval takes, and whether the schedule depends on it
Mezzanine or preferred equity Debt funds, family offices and insurers Covers part of the gap above the senior loan, at a fixed return paid before common equity Its cost, and what rights it gains if the project runs late; see preferred equity
Common equity Many individual LPs in a project LLC or development fund, or a single institution as JV partner Funded at closing or by capital calls, with no cash yield until the building earns income or is sold When their money is called, what happens if costs rise, and how the waterfall treats two years without income
Sponsor co-investment and guarantees The developer and its principals Cash in the deal plus guarantees signed in favor of the lender How much cash the sponsor has in, and whether its balance sheet can stand behind the guarantees

Worked example

Picture a $50.0 million apartment project. The inputs are assumptions for the arithmetic, not quotes from lenders or contractors.

  • Uses, $50.0 million: land $6.0 million, hard costs $33.0 million, hard cost contingency at 5% $1.65 million, soft costs (design, permits, legal, development fee) $5.35 million, interest reserve and loan costs $4.0 million.
  • Sources: a construction loan at 60% of cost, $30.0 million. Equity $20.0 million: investors 90% ($18.0 million), the developer 10% ($2.0 million). The first $20.0 million of costs is paid with equity before the lender funds a draw.
  • Interest reserve: at an assumed 7.5% all-in rate, with the loan about half drawn on average over 24 months of construction and about 90% drawn through 6 months of lease-up, interest comes to roughly $3.3 million. The rest of the $4.0 million covers loan fees and closing costs.
  • Investors needed: at an average check of $100,000, about 180 investors; at $250,000, about 72.
Illustrative, not a forecast. SOFR was 3.90% on November 12, 2026, and lender spreads differ. Add six months to construction and the reserve comes up short, which is the gap the carry guarantee exists to fill. Run your own equity and investor count in the capital raise calculator.

Guarantees and overruns

Who guarantees a construction loan, and who pays for cost overruns?

The developer's principals guarantee the loan, and overruns are paid in a set order: contingency first, then the guarantor, then the partners through capital calls. Investors read this order closely, because it decides whether a bad bid costs the sponsor or dilutes them.

  • Completion guarantee. The principals promise the lender the building will be finished to the approved plans, funding any shortfall themselves.
  • Carry or interest guarantee. They cover interest, taxes and insurance until the property can, which is what pays the gap if the interest reserve runs out.
  • Repayment guarantee. Some lenders also want part of the principal guaranteed, often reduced as the project meets leasing or income tests.
  • Contingency. Separate owner and contractor contingencies absorb the first overruns. Investors want to know who can spend each one and what has been used.
  • Capital calls and dilution. If contingency and guarantees are not enough, the operating agreement decides whether members must fund more, whether a member who does not fund is diluted, and whether the sponsor can lend to the deal at a priority return.

The construction contract sets how much of that risk stays with the builder. A stipulated sum or a guaranteed maximum price moves overruns inside the contract's scope onto the contractor; cost plus a fee without a cap leaves them with the owner. Common forms include AIA A101, A102 and A133; see choosing a general contractor and architect.

What investors underwrite

What do investors ask before funding a development?

Development investors want to know how the project could come in late or over budget, and who absorbs it if it does. Sponsors who answer with documents instead of reassurance close faster.

The development diligence topics investors raise first. Relli summary of common questions as of Nov 14, 2026; not a rating and not a lending standard.
TopicWhat investors askWhat to show
Entitlements Is zoning final? Which permits are issued and which are pending? Zoning and site plan approvals, permit status item by item, and any appeal window still open
Budget and contingency What share of the budget is bid rather than estimated, how large is the contingency, and who controls it? Line-item hard and soft costs, the share under contract, and owner and contractor contingencies shown separately
Draw schedule When is our money called, and when does the lender begin funding? Monthly sources and uses, the lender's draw and inspection process, and retainage
Timeline risk What do returns look like if construction or lease-up slips six or twelve months? A milestone schedule and a delay case that includes the loan's maturity and extension conditions
Interest reserve Does the reserve run through lease-up, at what assumed rate, and is the rate capped or swapped? The reserve math, the rate assumption and any cap or swap terms
Guarantor strength Who signed the guarantees, and could they actually pay? The lender's net worth and liquidity covenants and how the guarantor is compensated
Exit Who refinances or buys the finished asset, and at what cap rate? The lease-up assumptions, a refinance and a sale case, and recent sales of comparable new product
Track record Have you built this product, at this size, in this market, and did anything run over? Each project's budget against final cost and schedule against actual, including the ones that ran late

For the loan itself, including how a debt broker helps, see choosing a commercial real estate lender.

Lending in late 2026

Is construction financing harder to get now?

Yes. Banks tightened construction credit in the third quarter of 2026 while building activity slowed, which leaves developers needing more equity and sharper cost answers. These are the figures investors will hold your plan against, current as of November 13, 2026.

  • Banks tightened. In the Federal Reserve's October 2026 Senior Loan Officer Opinion Survey, covering roughly the third quarter, banks reported tighter standards and weaker demand for every commercial real estate loan category, including construction and land development. In the July 2026 survey, construction and land development standards had been basically unchanged.
  • Construction spending fell. The Census Bureau estimated total construction spending at a seasonally adjusted annual rate of $2,186.1 billion in September 2026, 1.9% below August and 2.7% below September 2025. Private residential spending fell 5.5% in the month; private nonresidential rose 1.1% (November 2, 2026).
  • Base rates. SOFR, the usual index for floating-rate construction loans, was 3.90% on November 12, 2026 (Federal Reserve Bank of New York), and the bank prime rate was 7.00% (Federal Reserve H.15).

When banks pull back, the gap moves to debt funds, preferred equity and LP equity, which is why developers are reaching past their usual investors. Conditions differ by product; the guides for build-to-rent, data centers, industrial and senior housing cover where much ground-up activity is concentrated.

Relli Form D data

How large are development raises, according to Form D?

Most single-project development raises are small and stay inside the sponsor's network; development funds raise more and advertise more. Those patterns come from 84 new Form D notices by U.S. issuers, filed from October 1, 2025 to September 30, 2026, whose names say development, construction, land, entitlement or build-to-rent.

Form D notices from issuers with development, construction, land or build-to-rent names, Oct 1, 2025 to Sep 30, 2026, by name type, beside the Construction industry group and all real estate. Relli's count from the SEC Form D data sets, pulled Nov 13, 2026.
GroupNoticesMedian offering sizeUsed Rule 506(c)Reported sales commissionsMedian stated minimum
All development-named offerings84$6.4 million27% (23)10% (8)$80,000
Single-project names48$2.75 million21% (10)4% (2)$50,000
Development fund names36$16.0 million36% (13)17% (6)$100,000
Land, entitlement and pre-development names18$17.5 million28% (5)11% (2)$100,000
Construction industry group, any name70$3.8 million11% (8)3% (2)$100,000
All real estate (Relli Form D study)4,172$5.0 million29.3%10.4%$50,000
  • One-off projects raise quietly. Just 21% of single-project names claimed Rule 506(c), and 2 of 48 reported paying sales commissions, consistent with sponsors raising from people they already know.
  • Funds go public more often. 36% of development fund names used Rule 506(c), above the 29.3% across real estate.
  • Land and entitlement vehicles are large. Their median stated size was $17.5 million, above development funds, with a $100,000 median minimum.
  • A few funds sell only to the very wealthy. 6 of the 84 notices relied on the Investment Company Act exclusion for qualified purchasers, people with at least $5 million in investments.
  • Raises file early. Among notices reporting investors at filing, the median was 6. Form D is due within 15 days of the first sale, so many raises file first and amend as they fill.

Method

Relli started from original filings (amendments excluded) by issuers with U.S. addresses in the SEC's quarterly Form D files covering 2025 Q4 through 2026 Q3, restricted to real estate industry groups (Commercial, Residential, Other Real Estate, REITs and Finance, Construction) or pooled investment funds, and kept names containing "development," "developer," "construction," "ground-up," "entitlement," "land fund," "land investors," "land holdings," "BTR" or "build-to-rent." It then dropped lending and debt names, stabilized build-to-rent DSTs, one operating construction company, venture and other non-real estate funds picked up by the word "development," small REIT preferred-share filings, and any sponsor that lists on Relli. A name counts as a fund if it contains "fund," "trust," "portfolio" or "REIT," or the pooled fund box is checked.

Figures are as issuers reported them; sizes can be estimates, and "Indefinite" sizes are excluded from medians. Most development entities carry a project name with no development word, so the rows are samples rather than totals. The all real estate row is Relli's study of 4,172 Form D offerings over the same period.

The same measures for each property type are in raising capital by property type.

Exemptions and vehicles

Should a development raise use Rule 506(b) or 506(c)?

Pick Rule 506(b) when your existing investors can fill the equity, and 506(c) when you need people you have not met. Either works for a development; the choice turns on your investor base, not the building. Under 506(b) you cannot advertise, but up to 35 non-accredited purchasers are allowed if they meet a sophistication test and get the required disclosure. A 506(c) raise can be marketed anywhere, provided every purchaser is accredited and the developer takes reasonable steps to confirm it; see how to verify accredited investors.

Development adds three timing questions:

  • All at closing, or on calls. A single project usually takes all its equity at the land or loan closing, because the lender wants it spent first. A development fund more often takes commitments and calls capital as projects start, which needs a clear remedy in the operating agreement for an investor who does not fund.
  • Separate early money. If friends and backers fund entitlements under one set of terms and the main raise comes later under another, counsel should decide whether these are one offering or two, and the disclosure should explain how early investors are credited.
  • Opportunity zone overlap. A ground-up project in a designated zone can be held through a qualified opportunity fund, which suits investors with capital gains; the 2027 zones start January 1, 2027. See how to start an opportunity zone fund.

The full trade-offs are in 506(b) vs 506(c) for real estate sponsors. A fund also brings Investment Company Act and adviser questions; see raising your first real estate fund.

Deal terms

How are the pref, promote and development fee structured in a development deal?

The parts are familiar from any syndication (a preferred return, a promote and sponsor fees), but two years or more without cash flow changes how each is written.

  • Preferred return. Investors usually get a pref that accrues through construction and is paid from refinance or sale proceeds, because there is no operating cash to pay it currently. Say whether it compounds and when it starts accruing; see preferred returns and waterfalls.
  • Promote. Development promotes often step up at higher return hurdles, paying the sponsor for value it creates rather than buys. Model the splits at the base case and a delayed case; the GP promote calculator does both.
  • Development fee. The developer is paid for running the project, usually as a percentage of development cost, often over the construction period and sometimes partly deferred to completion. Public filings show how one is written: Alexander's, Inc., a listed REIT, discloses that Vornado "is also entitled to a development fee equal to 6% of development costs, as defined" (10-K for 2025, filed February 9, 2026). That is a single disclosed agreement, not a market benchmark.
  • Guarantee fees. Some deals pay the principals who sign the completion and carry guarantees. Investors expect it disclosed in dollars beside the other fees.

Put every fee in dollars on the same pro forma as the waterfall, so investors can see what the sponsor still earns if the project is late or over budget. Fee benchmarks are in syndication fees and pref benchmarks and sponsor fees and promote.

Where the money comes from

Where can a developer find equity beyond past investors?

Past investors fund most first projects. As projects grow, developers add sources built for ground-up risk: institutional JV and programmatic partners, tax-motivated money such as opportunity zone funds, immigrant-investor capital through EB-5, landowners who take equity for their site, and listing marketplaces for investors the developer has not met.

Equity and equity-like sources for ground-up development, as of Nov 14, 2026, by who supplies or brings the money. The listing route leads because it is built for reaching investors a developer does not already know; Relli is first within it as publisher of this page.
RouteWho brings the investorFitsExemption
Investor marketplaces that publish offerings (Relli, plus LP Shares, PassivePockets and GP-LP Match) Investors who find the project on the marketplace and contact the developer Developers with completed projects who need more construction equity than their network holds 506(c); a public listing is general solicitation
Past investors and close backers You Pre-development money and most single-project raises 506(b) inside existing relationships, or 506(c)
Institutional JV and programmatic equity Your relationships, brokers and capital advisers Larger projects, or a series of them under one agreement, with the developer as a minority co-investor earning a promote A privately negotiated partnership with one institution
Qualified opportunity funds Your own QOF, or a third-party fund investing in zone projects Projects inside a designated zone, for investors with capital gains to defer; see the opportunity zone funds list Regulation D, with the fund's own tax tests on top
EB-5 regional center capital A regional center raising from foreign investors seeking U.S. residency Larger projects that can wait out a slow process and meet job-creation rules, often as a loan or preferred equity Commonly Regulation S for investors abroad, sometimes with Regulation D; immigration and securities counsel both needed
Landowner contribution The owner of the site Sites the owner would rather hold an interest in than sell outright Negotiated directly; the owner's interest is still a security
Family offices and preferred equity funds Introductions and your network Larger checks, a preferred slice above common equity, or land and entitlement plays Either; see the family office guide
Co-GPs, capital raisers and placement agents A partner with its own investors, or a registered broker-dealer paid a commission Developers with projects but a thin investor base, or funds large enough to carry a selling fee Either; check paying capital raisers and co-GPs and placement agents and broker-dealers

Data room

What goes in a development data room before you pitch investors?

A development data room should let an investor rebuild your budget, schedule and exit, and see who pays when one slips. Start with the items no stabilized deal has.

  • Entitlement file: the purchase contract or deed, zoning and site plan approvals, permit status, any conditions of approval, environmental and geotechnical reports, and title.
  • Hard and soft cost budget: line by line, with the share under contract, owner and contractor contingencies, and the development fee.
  • Construction contract: the signed or near-final agreement, the contract type, the builder's record and bonding, and the architect's agreement.
  • Loan package: the term sheet or commitment, loan-to-cost, rate, interest reserve, guarantees, extension tests and the takeout plan.
  • Draw and call schedule: milestones, monthly sources and uses, and the dates investor capital is due.
  • Guarantor financials: enough to show the principals can meet the lender's net worth and liquidity tests.
  • Market and exit: rent or sale comparables for new product, the assumed lease-up pace, and both a refinance and a sale case.
  • Model with stress cases: cost overruns, a 6- and 12-month delay, slower lease-up and a higher exit cap rate; see how to analyze a pro forma.
  • Build history: every completed project, budget against final cost and schedule against actual.
  • The legal set: the private placement memorandum, an operating agreement that spells out capital calls, default and dilution, the subscription agreement, and the Form D after it is filed.

Choosing a product type for the next project? Raising capital by property type links each sponsor guide: multifamily, industrial, self-storage, hotels, medical office and healthcare, senior housing, mobile home parks, net lease and retail, build-to-rent and data centers.

Sponsor questions

What do developers ask about funding a ground-up project?

How much equity does a ground-up development need?

Total cost less the construction loan and any mezzanine or preferred equity. If the lender funds 60% of a $50 million budget, the sponsor and its investors owe $20 million, and that money is spent before the first loan draw. Federal guidelines cap bank construction loans at 80% of value for commercial and multifamily projects, and most banks lend well below that.

How big are typical development raises?

Small for single projects, larger for funds. Among 84 new Form D notices filed by U.S. issuers from October 2025 to September 2026 with development, construction, land or build-to-rent in the name, single-project offerings had a median stated size of $2.75 million and development funds $16.0 million, in Relli's count.

What is a completion guarantee?

A promise from the developer's principals to the construction lender that the project will be finished on the approved plans, with the principals paying any overruns. It usually comes with a carry guarantee for interest, taxes and insurance until the property can cover them. Investors check that the guarantors have the liquidity to honor both.

Should the interest reserve cover lease-up as well as construction?

Usually yes. Interest keeps accruing until rents or a refinance can pay it, so investors expect the reserve to run through construction and a realistic lease-up at a stated rate. Show what happens if the project runs six months long, and who funds the shortfall.

Can a landowner put the land in as equity?

Yes. A landowner can contribute the site at an agreed value in exchange for an interest in the project entity, which lowers the cash you need to raise. Agree on the value, the owner's rights and where its interest sits in the waterfall before construction investors arrive, and treat the interest as a security with counsel.

Can opportunity zone or EB-5 money fund a development?

Both can. A project in a designated zone can take equity from a qualified opportunity fund, whose investors are deferring capital gains, and the 2027 zones start January 1, 2027. EB-5 regional centers lend or invest foreign investors' money in projects that meet job-creation rules, but the process is slow, so it rarely fits a tight schedule.

Will Relli list a development offering?

Yes, if the developer is established. Many that apply have funded past projects through institutions or a warm network and want construction equity from investors they don't know, some for the first time. Relli reviews each developer's background, track record and offering structure. Each developer chooses its own minimum, which appears on its offering page, and handles investor conversations itself.

Sources

  1. Form D data sets (2025 Q4 to 2026 Q3), SEC Division of Economic and Risk Analysis (period Oct 1, 2025 to Sep 30, 2026 | pulled Nov 13, 2026)
  2. 12 CFR Part 365, Appendix A: Interagency Guidelines for Real Estate Lending Policies (supervisory loan-to-value limits), Electronic Code of Federal Regulations (accessed Nov 13, 2026)
  3. RMS Manual of Examination Policies, Section 3.2: Loans (real estate construction loans), Federal Deposit Insurance Corporation (section dated May 2023 | accessed Nov 13, 2026)
  4. The October 2026 Senior Loan Officer Opinion Survey on Bank Lending Practices, Board of Governors of the Federal Reserve System (October 2026 survey | accessed Nov 13, 2026)
  5. The July 2026 Senior Loan Officer Opinion Survey on Bank Lending Practices, Board of Governors of the Federal Reserve System (July 2026 survey | accessed Nov 13, 2026)
  6. Monthly Construction Spending, September 2026 (CB26-176), U.S. Census Bureau (Nov 2, 2026)
  7. Secured Overnight Financing Rate (SOFR) data, Federal Reserve Bank of New York (rate for Nov 12, 2026 | accessed Nov 13, 2026)
  8. H.15 Selected Interest Rates (bank prime loan rate), Board of Governors of the Federal Reserve System (release of Nov 13, 2026)
  9. Descriptions of Multifamily Programs (Sections 221(d)(4) and 223(f)), U.S. Department of Housing and Urban Development (accessed Nov 13, 2026)
  10. List of all current AIA Contract Documents (A101-2017, A102-2017, A133-2019), AIA Contract Documents (accessed Nov 13, 2026)
  11. Alexander's, Inc. annual report for 2025 (Form 10-K), note on Vornado management and development agreements, SEC EDGAR (Feb 9, 2026)
  12. 17 CFR 230.506, exemption for limited offers and sales without regard to dollar amount, Legal Information Institute, Cornell Law School (accessed Nov 13, 2026)
  13. 15 U.S. Code 80a-2(a)(51), definition of qualified purchaser, Legal Information Institute, Cornell Law School (accessed Nov 13, 2026)
  14. Relli private real estate minimums data study (Form D, 4,172 offerings), Relli (Oct 20, 2026)
  15. Open and funded offerings, Relli (accessed Nov 13, 2026)